Surface Drainage Formation
Surface drainage formation gives runoff a connected route. Forming a depression without checking its outlet can simply relocate the ponding.
Before moving material
Identify catchment entry, the receiving outlet and levels along the route.
Receiving operation and checks
Stabilise the surface and inspect it during a suitable water event. Check continuous drainage through every join and crossing.
A grading pass does not size a drainage system or authorise discharge onto another property.
Read the complete Surface Drainage Formation guideTopsoil Redistribution
Topsoil redistribution should preserve the growing layer rather than use it as general structural fill. Changes in depth can affect later cultivation, turf or planting.
Before moving material
Measure existing topsoil depth and locate suitable receiving areas.
Receiving operation and checks
Complete crop or landscape soil preparation after redistribution. Check layer depth and look for unwanted mixing with subsoil or aggregate.
Do not assume soil from every high area is suitable growing medium.
Read the complete Topsoil Redistribution guidePoor Surface Drainage
Poor surface drainage can result from a blocked outlet, a reversed fall, a damaged crossing or local depressions. Grading should follow the identified cause.
Before moving material
Trace water from its entry point to the receiving outlet.
Receiving operation and checks
Inspect the drainage route during a suitable water event. Check that the complete route remains connected through boundaries and crossings.
Surface grading cannot remedy every subsurface drainage problem.
Read the complete Poor Surface Drainage guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group