Project reference 20850

Survey Crew — Drainage Formation

Identify the complete machine sequence, tractor interfaces and reference technology. A machine mentioned in a scenario is not a confirmed compatible attachment or a verified available configuration.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Machine Before - Dugong - Machine After

The machine before Dugong determines what material arrives; the machine after Dugong determines what surface must leave. An excavator can expose formation, a loader can deliver a stockpile, and a roller can compact the placed layer. The scraper's role is bounded by those interfaces.

Before moving material

Identify the upstream operation and its remaining defects.

Receiving operation and checks

Hand over the measured surface to compaction, cultivation, paving or turf preparation. Record which operation owns levels, materials and final acceptance.

The workflow can include Dugong where suitable; it does not assume Dugong replaces adjacent equipment.

Read the complete Machine Before - Dugong - Machine After guide

Surface Drainage Formation

Surface drainage formation gives runoff a connected route. Forming a depression without checking its outlet can simply relocate the ponding.

Before moving material

Identify catchment entry, the receiving outlet and levels along the route.

Receiving operation and checks

Stabilise the surface and inspect it during a suitable water event. Check continuous drainage through every join and crossing.

A grading pass does not size a drainage system or authorise discharge onto another property.

Read the complete Surface Drainage Formation guide

Drainage Grade Design

Drainage grade design must connect the contributing area to a suitable outlet. Selecting a numerical fall before checking the outlet can produce a surface that cannot discharge as intended.

Before moving material

Survey entry points, structures and the receiving level.

Receiving operation and checks

Inspect the constructed route and its transitions. Check invert continuity and controls at crossings.

This guide does not size drains or establish discharge permissions.

Read the complete Drainage Grade Design guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group