Survey Crew — Fill Area
Identify the complete machine sequence, tractor interfaces and reference technology. A machine mentioned in a scenario is not a confirmed compatible attachment or a verified available configuration.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
Machine Before - Dugong - Machine After
The machine before Dugong determines what material arrives; the machine after Dugong determines what surface must leave. An excavator can expose formation, a loader can deliver a stockpile, and a roller can compact the placed layer. The scraper's role is bounded by those interfaces.
Before moving material
Identify the upstream operation and its remaining defects.
Receiving operation and checks
Hand over the measured surface to compaction, cultivation, paving or turf preparation. Record which operation owns levels, materials and final acceptance.
The workflow can include Dugong where suitable; it does not assume Dugong replaces adjacent equipment.
Read the complete Machine Before - Dugong - Machine After guideCut-and-Fill Mapping
Cut-and-fill mapping shows differences between existing and target surfaces. Its colours are useful only when the surfaces share compatible references and the legend's sign convention is understood.
Before moving material
Check survey and design datum, extent and revision.
Receiving operation and checks
Use the map to plan movement and remeasure progress. Check sample locations and distinguish geometric volumes from usable material quantities.
Do not equate map balance with a guaranteed material balance after compaction.
Read the complete Cut-and-Fill Mapping guideGNSS Machine Control
GNSS machine control combines positioning, machine geometry and design information. An accurate receiver position is not automatically an accurate cutting-edge position.
Before moving material
Confirm corrections, sensor arrangement and the coordinate reference.
Receiving operation and checks
Check the completed surface with an independent method. Inspect offsets, design revision and correction status when results disagree.
Compatibility must be confirmed for the actual machine and control installation.
Read the complete GNSS Machine Control guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group