Excavator — Rough Dozer Grade

Identify the complete machine sequence, tractor interfaces and reference technology. A machine mentioned in a scenario is not a confirmed compatible attachment or a verified available configuration.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

From Rough Grade to Fine Grade

Rough grading establishes the broad shape; fine grading corrects the remaining smaller deviations. Trying to finish while bulk quantities are still wrong can waste passes and disturb completed areas. The changeover should occur when levels are close enough, materials are suitable and the receiving surface is ready for controlled trimming.

Before moving material

Complete major excavation and isolate unsuitable ground.

Receiving operation and checks

Protect the finished area from uncontrolled traffic and schedule the next layer. Check local levels and continuity through joins, not only the average elevation.

Fine grading cannot rescue a weak formation hidden beneath a neat finish.

Read the complete From Rough Grade to Fine Grade guide

Machine Before - Dugong - Machine After

The machine before Dugong determines what material arrives; the machine after Dugong determines what surface must leave. An excavator can expose formation, a loader can deliver a stockpile, and a roller can compact the placed layer. The scraper's role is bounded by those interfaces.

Before moving material

Identify the upstream operation and its remaining defects.

Receiving operation and checks

Hand over the measured surface to compaction, cultivation, paving or turf preparation. Record which operation owns levels, materials and final acceptance.

The workflow can include Dugong where suitable; it does not assume Dugong replaces adjacent equipment.

Read the complete Machine Before - Dugong - Machine After guide

How to Grade Before Asphalt

Grading before asphalt should establish the correct supporting profile and allow for the specified surfacing thickness. Resolve drainage and transition errors before paving.

Before moving material

Confirm the supporting-layer acceptance and finished elevations.

Receiving operation and checks

Hand over to the asphalt contractor with level and acceptance records. Check joints, gutters and connections to existing pavement.

Asphalt placement should not be presented as a function of the scraper.

Read the complete How to Grade Before Asphalt guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group